An additional building at this school required a visually neat solution for running cable tray and pipework along the same path. Gripple had the perfect products to achieve this using a combination of FastTrak being installed into the concrete, along with FastTrak hung with our QT UniGrip Hanger, secured with seismic bracing, which was a requirement for the building. Pipework was secured to the FastTrak brackets using off the shelf pipe clamps. The Client was impressed with the competitive pricing and the speed at which the FastTrak was installed.
A great example of how Gripple’s innovative solutions can help contractors overcome difficult challenges on site.
This new School had little room to manoeuvre in the ceiling space, a combination of Gripple Fast Trak & Quarter Turn Pipe Clamps meant that the Electrical Tray and Pipework could run side by side on the same pre-fabricated bracket!
Gripple’s UniGrip solutions were used in conjunction with the Pre-Fab bracket when longer drops were needed. Our in house Engineering Team provided a Seismic design so our Patented Seismic Bracing system could be easily installed keeping the project compliant with 1170.4.
Simple to install, simple to transport around site & with no hot works the time & labour savings just keep on growing.
-
Select options This product has multiple variants. The options may be chosen on the product page
Fast Trak ™ Standard
$1,000.00