We are proud to announce the successful installation of Gripple’s Fast Trak system in a major new distribution centre located in Victoria.
This project underscores Fast Trak’s ability to deliver rapid, safe, and highly adaptable mechanical and electrical (M&E) services suspension in demanding, large-scale environments.
Distribution centres are critical infrastructure, demanding efficient build times and highly flexible internal fit-outs to support dynamic operations. Gripple’s Fast Trak system was chosen for this project due to its proven track record in significantly reducing installation times and enhancing on-site safety, aligning perfectly with the rigorous demands of modern logistics and warehousing.
Key benefits delivered by FastTrak include:
-
- Up to 6X Faster Installation: Fast Trak’s pre-fabricated, tool-free design dramatically cut down installation hours compared to traditional threaded rod and channel methods.
- Enhanced Safety: By eliminating the need for on-site cutting, filing, and hot works, Fast Trak minimised health and safety risks, creating a safer working environment for installers. Its lightweight nature also reduces manual handling strain.
- Optimal Space Utilisation: The system’s multi-tiered capability and ability to support various services (electrical containment, pipework, ductwork) in one compact trapeze bracket allowed for efficient use of overhead space – crucial in high-density distribution environments.
- Flexibility for Future Adaptation: As distribution needs evolve, FastTrak’s easy adjustability ensures that M&E services can be quickly reconfigured without major disruption, offering long-term adaptability.
- Reduced Waste & Environmental Impact: The prefabricated solution meant minimal on-site waste, contributing to a cleaner, more sustainable construction process and reducing the project’s embodied carbon footprint.
Products used on the project
-
Fast Trak ™ Standard
$1,000.00