Time, Labour & Space Saving
An additional building at this school required a visually neat solution for running cable tray and pipework along the same path. Gripple had the perfect products to achieve this using…
An additional building at this school required a visually neat solution for running cable tray and pipework along the same path. Gripple had the perfect products to achieve this using…
A recent project showcased the impressive efficiency of the Gripple Trapeze system, where 75 meters of basket tray was installed with ease and precision. With 3 meter intervals, the installation…
Where: Bendigo, Victoria What: Supplied Gripple cable tray suspension systems and non-structural seismic bracing When: Construction began in 2013 and is due for completion by the end of 2016
Where: Perth, Western Australia What: Supplied Gripple cable tray suspension systems and non-structural seismic bracing When: Scheduled to be opened by the end of 2016